Foundry Case Studies
Latest Posts
Case Study: Casting Cooling Solution
Challenge
Customer needed a process in which castings could be cooled within an efficient space and time period with no transmittal of force to the environment as was being experienced from vibratory units provided from past suppliers, and without a re-design of the existing plant footprint.
April 19th, 2011 | < 1
Case Study: Foundry Melt Department...
Case Study: Melt Department Upgrades Dura-Bar Furnace Charge System Challenge For over 40 years, Dura-Bar has been recognized as the industry leader in producing continuous cast iron. In order to […]
April 15th, 2011 | 2 min Read