Challenge

The customer had a series of existing metal belt apron conveyors that transported sprue up a large incline. Their system included General Kinematics tunnel conveyors that led up to these apron conveyors. The subsequent discharge created piles of material to be re-melted in their furnace. The apron conveyors were extremely high in maintenance and were causing the foundry many problems.

Approach

Needing to get the material up a considerable amount of elevation, GK’s sales and engineering teams went to work in developing several creative designs to determine the best solution for this challenge.

Solution

GK modified the existing tunnel conveyors to begin the incline much further back in the system to gain the maximum amount of elevation. These were followed by curved section conveyors to absolutely minimize any elevation that would be needed at the transfers. Lastly, the curved sections were followed by very long steeply inclined conveyors to gain the maximum elevation possible.

Results

The results of these modifications worked very well and the customer is extremely satisfied with the results. The units are in and operating and the feedback has been excellent. Down time has been decreased significantly and this improved system is working very well.

About General Kinematics
General Kinematics Corporation, incorporated in 1960, was established to market, design, and custom fabricate innovative vibratory materials handling and processing equipment. Today the company is one of the world’s largest suppliers of vibratory processing equipment, holding more than 200 worldwide patents, and is acknowledged as a major contributor to the technical advancement of vibrating equipment design and application. Today, over 50,000 General Kinematics units have been installed in virtually all of the world’s industrialized countries. For more information about General Kinematics products and services, visit the company’s website at www.generalkinematics.com.

 

Leave a Reply

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

Related Case Studies

Bottom Ash Conveyor

Covanta Pinellas: A Lasting Impression

Covanta, one of the largest mass-burn facilities in North America, explores their 30-year relationship with General Kinematics. Converting MSW to renewable energy for Pinellas county, Covanta depends on the reliability of their equipment to run without fail. GK’s Bottom Ash Conveyors have been able to provide 95-98% uptime.    Learn more about it in the […]

Read More
Queensland two-mass mining screen installation

Client Case Study: Australia Coal Mine

In 2016, a CPP coal mine site in Australia wanted to handle higher ash seams than the CPP had been designed for. It also was looking to recycle coking coal tailings to produce a thermal product. To achieve this, the mine needed an increased reject screen capacity of up to 1000 tph from their current […]

Read More
Shakeout

A 50 Year-Old Shakeout

In early 2018, a midwestern aluminum foundry in the United States was looking to purchase a vertical shakeout. Referencing the current General Kinematics shakeout that was running very well at their plant, the foundry was looking for the exact same design. The surprising fact? The vertical shakeout that was running 10 tons per hour at […]

Read More