Foundry Case Studies
Latest Posts
Case Study: No Bake Technology
A South Carolina foundry decided to put the GK VIBRA-DRUM® to the test in their process. With only two other installations of the VIBRA-DRUM® in a No Bake foundry, the […]
November 12th, 2015 | 4 min Read
Case Study: Not Your Ordinary...
Challenge At the bottom of their rotary train dump, a power plant on the Ohio River near Paducah, KY had two reciprocating feeders that were no longer feeding reliably and […]
October 13th, 2015 | 2 min Read
Save Space, Save Money: GK’s...
Is your foundry large enough to house conveyors for cooling off castings? Are you limited by space? How about ventilation? If you’re dreaming of a transient vibration-free, environmentally conscious work […]
August 18th, 2015 | 2 min Read
Case Study: SPIRA-COOL® Solution
Challenge A North American foundry customer had two existing parallel lines in their facility. The second line was to be modified and run a special alloy material. To compound this […]
January 6th, 2015 | 2 min Read
Case Study: Inclined Conveyors
Challenge A Midwest foundry had limited space for their sand reclamation system. Unable to expand the building to gain the room needed or reposition their system to fit the necessary […]
December 30th, 2014 | < 1
Case Study: VIBRA-MILL® in Action
Challenge A Midwest foundry required a unit that could not only handle their large, unique-shaped, no-bake molds but also process to their production requirements. Approach After researching equipment providers, the […]
October 30th, 2014 | < 1