Recycling Case Studies
Latest Posts
Case Study: De-Stoner for Cleaning...
Challenge: Prior to the installation of a wood preparation system ahead of a pelletizing unit, GKC conducted testing to show how the De-Stoner air classifier could be used to remove […]
August 12th, 2011 | 2 min Read
Case Studies
Read MoreCase Study: Copper Detection System
Challenge Copper content reduces the value of scrap material in the ferrous foundry industry. Metal recycling facilities, therefore, look to provide certification on the scrap they provide to increase the […]
August 5th, 2011 | 2 min Read
Case Studies
Read MoreCase Study: High Energy Feeders...
Problem or Potential Need: The transfer and spreading of non-ferrous auto shred residue (ASR) for better presentation to an Eddy Current Separator (ECS). Poor presentation results in ineffective separation of […]
August 4th, 2011 | 2 min Read
Case Studies
Read MoreCase Study: Recycling System Upgrade...
Challenge A C&D recycler started in the recycling business a number of years ago. The customer went out and purchased a used portable screen and pick belt to make a […]
August 2nd, 2011 | 2 min Read
Case Studies
Read MoreCase Study: GK De-Stoner Eliminates...
Challenge A customer recently contacted General Kinematics to explore alternatives to their water bath, wet tank arrangement that they were currently using to separate heavies from lights in an existing […]
August 2nd, 2011 | 2 min Read
Case Studies
Read MoreMRF facility opens in Tulsa
General Kinematics recently completed the commissioning of a new CD-XL recycling system at Tulsa Recycling and Transfer, of Tulsa, Okla. The new MRF facility was designed to recover OCC (Old […]
April 23rd, 2011 | 2 min Read
Case Studies
Read More