Case Studies
Latest Posts
Case Study: No Bake Technology
A South Carolina foundry decided to put the GK VIBRA-DRUM® to the test in their process. With only two other installations of the VIBRA-DRUM® in a No Bake foundry, the […]
November 12th, 2015 | 4 min Read
Case Study: Not Your Ordinary...
Challenge At the bottom of their rotary train dump, a power plant on the Ohio River near Paducah, KY had two reciprocating feeders that were no longer feeding reliably and […]
October 13th, 2015 | 2 min Read
Case Study: Rotary Drum Liners
Challenge A North American foundry had an existing rotary drum in their facility. The drum liners had become severely worn and damaged over time and required new liners installed. Approach […]
September 29th, 2015 | < 1
Save Space, Save Money: GK’s...
Is your foundry large enough to house conveyors for cooling off castings? Are you limited by space? How about ventilation? If you’re dreaming of a transient vibration-free, environmentally conscious work […]
August 18th, 2015 | 2 min Read
SXS SCREEN™ Debuts at New...
Earlier this year, General Kinematics had the honor of working with Peconic Recycling and Transfer Station in New York to install vibratory equipment for their new construction and demolition (C&D) […]
July 22nd, 2015 | 2 min Read
Case Study: A Next Level...
Challenge A synthetic polymer producer was looking for unique technology that could work in their new production line. This line was going to run custom polymers and compounds. They needed […]
June 9th, 2015 | 2 min Read