Case Studies
Latest Posts
SXS SCREEN™ Debuts at New...
Earlier this year, General Kinematics had the honor of working with Peconic Recycling and Transfer Station in New York to install vibratory equipment for their new construction and demolition (C&D) […]
July 22nd, 2015 | 2 min Read
Case Studies
Read MoreCase Study: A Next Level...
Challenge A synthetic polymer producer was looking for unique technology that could work in their new production line. This line was going to run custom polymers and compounds. They needed […]
June 9th, 2015 | 2 min Read
Bulk Processing Case Studies
Read MoreCase Study: Modular Feeders
Challenge A major power company needed to replace two existing GK feeders that had been in use for over 35 years. During that time, the space had become very crowded […]
April 27th, 2015 | 2 min Read
Case Studies
Read MoreCase Study: SPIRA-COOL® Solution
Challenge A North American foundry customer had two existing parallel lines in their facility. The second line was to be modified and run a special alloy material. To compound this […]
January 6th, 2015 | 2 min Read
Case Studies
Read MoreCase Study: Inclined Conveyors
Challenge A Midwest foundry had limited space for their sand reclamation system. Unable to expand the building to gain the room needed or reposition their system to fit the necessary […]
December 30th, 2014 | < 1
Case Studies
Read MoreCase Study: Flat Deck Screen...
The Battle Continues… Challenge A southeast construction and demolition (C&D) recycling facility was operating a rotary trommel screen as part of their outdoor C&D recycling operation. The trommel screen works […]
December 16th, 2014 | 3 min Read
Case Studies
Read More