Dump Feeder
Llambec’s years of design and experience in Vibratory Equipment were again put to the test when approached by Boynton for their Platinum Mine in the Pilanesberg to find a solution to the lack of sufficient feed into the plant from their existing Tip Areas, which had been ongoing for a few years. Three tip areas […]
July 8th, 2026 | < 1
Ferro Silicon Fine Screening
Llambec was approached by a company that produces Ferro Silicon for Densification purposes. Screening Ferro Silicon at micron sizes below 200 efficiently has always been a major problem, resulting in Low capacities, efficiencies, and high maintenance costs. Llambec technology replaced the existing circular Motion Screens used in the industry and, after lengthy trials, tests, and […]
July 8th, 2026 | < 1
Kinetic Screen
Two Kinetic Energy Saving Screens were installed at Exxaro R & D as a pilot Plant for test purposes on Coal and Iron Ore. Both Screens are 1500 wide x 3660 long. One is a Double-Deck Kinetic Screen; the other, a Single-Deck, both capable of handling 250 tph. As can be seen from the pictures […]
July 8th, 2026 | < 1
Llambec Cooling Tray Furnace Feeder
The GK Llambec team was approached to assist a customer with a problem they were having with feeding Steel Slithers and removing the sand/rust stuck to them. The purpose of the Screen is to control the Steel Slithers into Baskets 1, 5 m³ Volume with other Ingredients added, which is then removed and stored for […]
July 8th, 2026 | < 1
Llambeck By-Pass Bin
A Large Platinum Mine in the Rustenburg area had a By-Pass Bin System used when the Plant was not in operation. Two main conveyors running in parallel, 2 m apart, could not be fed by two Brute Force Feeders with the correct tonnage. One of the feeders had a starvation problem due to incorrect Bin […]
July 8th, 2026 | < 1
GK Llambec Railcar Feeder
GK Llambec was tasked with designing a feeder that would extract rom gold ore from under the reef silo to fill 8 rail hoppers at a rate of 1000 TPH. The project was completed within two months of receiving the green light from the ATS management team. GK Llambec designed, built, and installed a huge […]