Case Study: Modular Feeders
Challenge A major power company needed to replace two existing GK feeders that had been in use for over 35 years. During that time, the space had become very crowded […]
April 27th, 2015 | 2 min Read
Case Study: SPIRA-COOL® Solution
Challenge A North American foundry customer had two existing parallel lines in their facility. The second line was to be modified and run a special alloy material. To compound this […]
January 6th, 2015 | 2 min Read
Case Study: Inclined Conveyors
Challenge A Midwest foundry had limited space for their sand reclamation system. Unable to expand the building to gain the room needed or reposition their system to fit the necessary […]
December 30th, 2014 | < 1
Case Study: Flat Deck Screen...
The Battle Continues… Challenge A southeast construction and demolition (C&D) recycling facility was operating a rotary trommel screen as part of their outdoor C&D recycling operation. The trommel screen works […]
December 16th, 2014 | 3 min Read
Case Study: VIBRA-MILL® in Action
Challenge A Midwest foundry required a unit that could not only handle their large, unique-shaped, no-bake molds but also process to their production requirements. Approach After researching equipment providers, the […]
October 30th, 2014 | < 1
Case Study: Rotary Drums Done...
Challenge A Canadian foundry had several rotary drums in their facility and were looking to update one of their rotary drums. Their application required careful handling of intake manifolds, yet […]