Case Studies
Latest Posts
Case Study: C&D Systems at...
Challenge A new prospect in Ohio came to General Kinematics seeking assistance in the development and installation of a new C&D Sorting System. This process took over two years working […]
January 9th, 2014 | 3 min Read
Case Study: UMO to the...
Challenge A successful North American scrap metal recycling company decided to research upgrading their facility. Operating a fully integrated facility, they purchase a wide range of ferrous and non-ferrous […]
January 2nd, 2014 | 2 min Read
Case Study: Effective Distribution of...
Challenge An aluminum disk manufacturer on the east coast was looking for a better solution to meter their product. This was not the only challenge though – they also needed […]
December 27th, 2013 | 2 min Read
Case Study: How GK Removed...
Challenge General Kinematics was notified that vibration was being transmitted to neighborhood homes in the Green Bay area. Due to the unusually high water table, the massive balanced units installed […]
December 20th, 2013 | 2 min Read
Case Study: Trommel System vs....
Challenge Trommel systems are sold as a turn-key solution and are portable. They are reasonably priced and most components are already made so lead time is very quick. […]
December 3rd, 2013 | 2 min Read
Case Study: Sand Reclaim Systems
Challenge Thousands of dollars were being wasted at an aluminum foundry due to inability to reclaim sand from their process. In addition, disposal costs were exorbitantly high and hurting the […]
November 25th, 2013 | < 1