Challenge During the recent down turn in available C&D Material, a Midwest recycler was looking for other types of material that could be processed through his facility. Like most facilities, […]
November 11th, 2013 | < 1
Case Study: High Flow Feeder...
Challenge A Midwest foundry required a method to transfer prepared sand in bypass mode to deliver sand to a secondary molding area. The existing chute was leaking, plugging and causing […]
November 4th, 2013 | < 1
Case Study: More than a...
Challenge A Midwest aluminum recycling company needed a new charge feeder to load the aluminum furnace. Their existing unit by another manufacturer could only handle light duty materials and was […]
October 28th, 2013 | 2 min Read
Case Study: Magnesium Scrap Conveyor
Challenge Power Transmission Company required a method to transfer varying sizes of magnesium scrap to a crusher. The maximum load height of the machine could not exceed 8’-6” and the […]
October 21st, 2013 | 2 min Read
Case Study: No-Bake Foundry
Challenge A Midwest no-bake foundry had two objectives to improve their business– to increase production rates and develop larger mold sizing (5 foot square). In review of their existing process, […]
October 15th, 2013 | 2 min Read
Case Study: Zinc Recovery System
Challenge A Midwest zinc company had utilized a General Kinematics VM-120 VIBRA-MILL® with great success for a number of years as an off-line process for reclaiming zinc dross. But as […]