GK Llambec was tasked with designing a feeder that would extract rom gold ore from under the reef silo to fill 8 rail hoppers at a rate of 1000 TPH.

The project was completed within two months of receiving the green light from the ATS management team. GK Llambec designed, built, and installed a huge 2000-wide x 6000-long kinetic energy-saving feeder.

  • Ore tonnage increased from an average of 7, 500 t/m to 68 000 in the first month of operation, with the potential to increase to 120 000 t/m
  • Operational costs reduced by approximately R250, 000 per month (based on R7, 500 t/m).
  • The time it used to take to load the 8 Rail Hoppers has been reduced from 14 hours to 40 minutes.
  • Brute Force Equipment of the traditional type was not possible because of height and power restrictions. As well as the need to stop and start under load.
  • The Kinetic Feeder is run with 2 x 3,5 kW Vibratory Motors only.
General Kinematics Corporation, incorporated in 1960, was established to market, design, and custom fabricate innovative vibratory equipment for the foundry, recycling, mining, and processing industries. Today the company continues as one of the world’s largest suppliers of vibratory processing equipment and has evolved into an industry-leading EPC firm. Headquartered in Crystal Lake, IL, General Kinematics has seven global locations providing engineering and support to a world-wide customer base. GK is a third generation, family-owned company and is ISO 9001 certified.