Case Studies
Latest Posts
Built to last.
In operation since the mid 1960’s, this General Kinematics vibratory conveyor is still running strong, even after being subjected to foundry operations for over 40 years. Checking out the operation […]
February 22nd, 2012 | < 1
Case Study: Custom Designed Conveyor...
Challenge A Southern US Steel Fabricator was in need of a low headroom conveyor to capture small scrap sections from their cutting tables. Existing hoppers and a short aisle for […]
October 17th, 2011 | 2 min Read
Case Study: Large Storage Feeder...
Challenge: A shredder operator had a need to re-feed Auto Shred Residue (ASR) back into their system for non-ferrous removal. The material is mostly fluff and light weight by nature. […]
August 12th, 2011 | 2 min Read
Case Study: De-Stoner for Cleaning...
Challenge: Prior to the installation of a wood preparation system ahead of a pelletizing unit, GKC conducted testing to show how the De-Stoner air classifier could be used to remove […]
August 12th, 2011 | 2 min Read
Case Study: Copper Detection System
Challenge Copper content reduces the value of scrap material in the ferrous foundry industry. Metal recycling facilities, therefore, look to provide certification on the scrap they provide to increase the […]
August 5th, 2011 | 2 min Read
Case Study: Finger-Screen Reduces Downtime
Problem or Potential Need: Punchings from a stamping facility can cause havoc at the baler. History: During the stamping process literally thousands of -1 ¼” punchings of different shapes are […]
August 4th, 2011 | < 1