New C&D Installation in Canada
Check out the latest General Kinematics C&D installation in Canada. Ready to efficiently screen, sort, and recover C&D material, this system is engineered to easily process 50 MTPH and achieve […]
February 11th, 2016 | 2 min Read
Case Studies
Read MoreCase Study: Custom Vibratory Lump...
Challenge General Kinematics is renowned around the world for solving unique process challenges. So when a South American fertilizer manufacturer called with a unique problem they were experiencing, GK accepted […]
December 8th, 2015 | 2 min Read
Case Studies
Read MoreCase Study: No Bake Technology
A South Carolina foundry decided to put the GK VIBRA-DRUM® to the test in their process. With only two other installations of the VIBRA-DRUM® in a No Bake foundry, the […]
November 12th, 2015 | 4 min Read
Case Studies
Read MoreCase Study: Not Your Ordinary...
Challenge At the bottom of their rotary train dump, a power plant on the Ohio River near Paducah, KY had two reciprocating feeders that were no longer feeding reliably and […]
October 13th, 2015 | 2 min Read
Case Studies
Read MoreCase Study: Rotary Drum Liners
Challenge A North American foundry had an existing rotary drum in their facility. The drum liners had become severely worn and damaged over time and required new liners installed. Approach […]
September 29th, 2015 | < 1
Case Studies
Read MoreSave Space, Save Money: GK’s...
Is your foundry large enough to house conveyors for cooling off castings? Are you limited by space? How about ventilation? If you’re dreaming of a transient vibration-free, environmentally conscious work […]
August 18th, 2015 | 2 min Read
Foundry Case Studies